Design and Implementation of Optimum Management System using Cost Evaluation and Financial Analysis for Prevention of Building Failure
- 1 Islamic Azad University, Iran
Abstract
Building management is complex as the implementation of the engineering management system and is subjected to require the top management for supporting the construction industry. To achieve this management must use a system to control the preventive management of building failure. The purpose of the paper is to develop a new approach to optimize the management process for systematic prevention of building failure. To optimum the management of building elements and equipments, the data from 4 case studies are used. These data are analyzed by computation of financial and economical systems. For building managers seeking to expand their knowledge of a particular process or preventive management systems in general, the paper provides a practical understanding. The process developed in this research will help firms of engineering/managing with a reliable implementation tool for their buildings installation and this will promote engineering management development.
DOI: https://doi.org/10.3844/ajeassp.2016.281.296
Copyright: © 2016 Nima Amani. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
- 4,031 Views
- 2,517 Downloads
- 0 Citations
Download
Keywords
- Engineering Management
- Case Study
- Building Management
- Cost Evaluation
- Process Analysis