Development of Integrated Production Scheduling System in the Process Industry
Abstract
This study introduces a three-level hierarchical production planning and scheduling approach developed and implemented in a resin factory. Our approach proposes at the first level a mixed-integer linear programming for solving the aggregate planning model. At the second level, a weighted-integer goal-programming model is developed to disaggregate the developed aggregate plans. A sequencing algorithm is developed for the third level that tends to minimize the total weighted tardiness. Real industrial data is used to test and validate the proposed models.
DOI: https://doi.org/10.3844/jcssp.2005.395.399
Copyright: © 2005 Mohamed K. Omar, Yasothei A.P. Suppiah and Siew C. Teo. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
- 3,252 Views
- 2,601 Downloads
- 0 Citations
Download
Keywords
- Hierarchical Production Planning (HPP)
- Integration
- Integer Programming
- Goal Programming
- Tardiness