A Real Time Practical Approach for Multi Objective Job Shop Scheduling Using Fuzzy Logic Approach
Abstract
Multi objective Job Shop scheduling is a difficult task in both theoretical and practical solving issues. Problem statement: In the present scenario the modern Engineering and Industrial manufacturing units are facing lot of problems in many aspects such as machining time, raw material movement, man power requirement, electricity demand and customer satisfaction. Approach: A triangular fuzzy membership function is used to represent customer priority and due date. Results: A fuzzy rule-based system is developed which determines the study to be allocated to N number of machines with M number of Jobs in the following premise variables: size of the job, workload on the shop floor and the priority of the job. Multi objective fuzzy job shop scheduling problems are formulated as three-objective ones which not only maximize the minimum agreement index but also maximize the average agreement index and minimize the maximum fuzzy completion time. Conclusion/Recommendations: The study is analyzed on real-world data obtained from a printing company and the results are found satisfactory.
DOI: https://doi.org/10.3844/jcssp.2012.606.612
Copyright: © 2012 R. Ramkumar, A. Tamilarasi and T. Devi. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
- 2,988 Views
- 2,955 Downloads
- 2 Citations
Download
Keywords
- Job shop scheduling
- fuzzy logic
- multiple objectives
- rule base
- multi criteria scheduling